Role T&V Lab Technician Location Bothell , WA Duration 12+months (Possible Extension) Shift 1st shift Pay Range $30– $35.60 per hour on W2 Job Description: T&V Lab Technician In this role, you have the opportunity to make life bett...
WORK HOURS: 6AM to 2:30PM, maybe up to 4:30PM, when OT is needed. • HOURS PER WEEK: 40 to 50; may need to work.... DESCRIPTION: • GENERAL REQUIREMENTS: 25% • Record and document each inspection process in accordance with company documented procedures...
WORK HOURS: 6AM to 2:30PM, maybe up to 4:30PM, when OT is needed. • HOURS PER WEEK: 40 to 50; may need to work.... DESCRIPTION: • GENERAL REQUIREMENTS: 25% • Record and document each inspection process in accordance with company documented procedures...
data requirements. DESCRIPTION: • GENERAL REQUIREMENTS: 25% Record and document each inspection process in accordance... boxes and/or carts (dolly’s) ranging from 5 to 50 pounds on a daily basis. • Must support repetitive tasks of bending...
data requirements. DESCRIPTION: • GENERAL REQUIREMENTS: 25% Record and document each inspection process in accordance... boxes and/or carts (dolly’s) ranging from 5 to 50 pounds on a daily basis. • Must support repetitive tasks of bending...
(RBI), and failure mode effect analysis (FMEA). Ability to read and interpret P&ID's, piping isometrics, and general... arrangement drawings. Willingness to travel to PSE power plants more than 50% of the time. Ability to communicate...
(RBI), and failure mode effect analysis (FMEA). Ability to read and interpret P&ID’s, piping isometrics, and general... arrangement drawings. Willingness to travel to PSE power plants more than 50% of the time. Ability to communicate...
. For over 50 years, we’ve partnered with public and private clients across the U.S. to deliver infrastructure planning... based upon notes, sketches, vendor drawings, the Statement of Work (SOW) or Design Basis Document (DBD) and general...
of drafters as required. About Us AtkinsRéalis is a world-class engineering services and nuclear organization. For over 50... based upon notes, sketches, vendor drawings, the Statement of Work (SOW) or Design Basis Document (DBD) and general...